Commercial driveway permit
Apply for a permit to build or modify a commercial driveway. Check what supporting information to provide.

When you need a permit
You need a commercial driveway permit to:
-
build a new driveway, including one approved as part of a development application
-
modify an existing commercial driveway.
Apply for a commercial driveway permit
You need to supply a detailed site plan with your permit application. It must include the:
- location of the proposed driveway relevant to the frontage or frontages of the property, including the street name
- location of any existing driveways, if you’re applying for an additional driveway or replacing an existing driveway
- north point
- proposed width of the driveway
- proposed location in relation to other assets, such as street trees, utility infrastructure and bus stops
- proposed finish, such as broomed finished concrete and exposed aggregate.
You also need to supply photos showing the:
- location of the proposed or existing driveway
- area surrounding the location of the proposed or existing driveway.
Apply for your driveway permit online using the Application/Notice to Work on Council Property form.
You can pay the application fee of $685.00 with a Visa or Mastercard.
New driveway
A permit application for a driveway that’s not part of a development application will be assessed by a Built Environment Officer within 5 working days. If required, a site inspection will be completed during the assessment process.
A permit application for a driveway that’s part of a development approval will be assessed by a Development Assessment Engineer within:
- 10 working days for a standard commercial driveway permit
- 15 working days if a Schedule 12 is required.
If your application is approved, you’ll receive a permit with relevant conditions.
Modification to a driveway
Permit applications for resurfacing, repairs or modifications to a driveway will be assessed by a Built Environment and Land Use Officer within 10 working days. If required, a site inspection will be done during the assessment process.
A permit application for work to a driveway that’s part of operational work or a development approval will be assessed by a Development Assessment Engineer within 10 to 15 working days.
If your application is approved, you’ll receive a permit with relevant conditions.