Find out about temporary closures and detours to Brisbane bike paths before you plan your ride.

Woman standing beside a blue women's bicycle looking at smartphone at Bretts Wharf.

Current and scheduled bikeway closures

Check the bikeway and shared path closures and detours before riding in Brisbane.

The following closures are long-term closures on major bikeways across the city.

mdi information outline1

Note

Council ensures all organisations closing any part of a bikeway notify users of the closure and, if applicable, the detour. This applies to both short-term and long-term closures.

Central closures

The Riverwalk between One Eagle (formerly Waterfront Place) and Riparian Plaza is closed to pedestrians and cyclists/scooters until late-2025.

The closure is required to enable construction of Waterfront Brisbane and the new and improved 250-metre Riverwalk.

The adjoining access path adjacent to the Waterfront Brisbane site, running from Eagle Street to the Riverwalk near Riparian Plaza, is closed until late-January 2026.

Alternate routes are in place during the closure. These include:

  • cyclist detour via Edward Street and Elizabeth Street on the designated cycle paths
  • pedestrian detour via Felix Street and Eagle Street
  • access to the Stamford Plaza and River Hub facilities via the City Botanic Gardens Riverwalk entrance
  • all user access on the northern side of Riparian Plaza or One One One between Eagle Street and the Riverwalk.

For more information:

  • email the Waterfront Brisbane team

Pedestrian access has switched from the temporary upper pathway through C.T. White Park to the original lower riverwalk.

This is to facilitate construction works for the Kangaroo Point Bridge.

You can expect:

  • temporary changes to shared path access in C.T. White Park
  • a protective overhead gantry over a small section of the pathway with CCTV cameras
  • new signs and line markings
  • signage to direct pedestrians, cyclists, scooter riders and motorists around the work areas, as required.

For more information:

North closures

There are currently no bikeway closures or detours.  

South closures

There are currently no bikeway closures or detours.  

East closures

Council is upgrading the western side of the Minnippi Parklands bikeway/shared pathway to widen and smooth the existing path. Work will take place from 28 April to 5 June 2025 (weather permitting).

The path on the western side will be closed during the works and signs will be in place to refer pathway users to use the eastern pathway.

West closures

There are currently no bikeway closures or detours.  

mdi information outline1

Note

In June 2023, Queensland Rail and the Cross River Rail Delivery Authority removed the timber portion of the Normanby pedestrian bridge for Cross River Rail works.

Use the Victoria Park land bridge for access between Victoria Park / Barrambin and Spring Hill.

For more information, contact Cross River Rail.

Request a bikeway closure

You can request to partially or fully close a bikeway in Brisbane for maintenance, major construction or to hold an event.

Complete the online application to temporarily close an off-road shared pathway/bikeway.