Changed traffic and parking conditions for Brisbane Marathon

Traffic and parking changes will be in place on Saturday 1 June and Sunday 2 June in Brisbane City, Fortitude Valley, Kangaroo Point, Teneriffe and Woolloongabba due to the Brisbane Marathon Festival.

The following roads will be closed from 3am-1pm Sunday 2 June: 

Brisbane City 

  • Alice Street between Albert Street to Edward Street 
  • Albert Street between George Street to Felix Street
  • Margaret Street between George Street to Felix Street
  • Edward Street between Alice Street to Margaret Street

The following roads will be closed from 3.30am-12.45pm Sunday 2 June: 

Brisbane City 

  • Queen Street between Wharf Street to Adelaide Street
  • Adelaide Street between Queen Street to Boundary Street
  • Howard Street between Macrossan Street to End of Street
  • Macrossan Street between Adelaide Street to End of Street
  • Arch Lane between Macrossan Street to End of Street
  • Boundary Street between Ann Street to End of Street

The following roads will be closed from 3.30am-1pm Sunday 2 June: 

Brisbane City 

  • Mary Street between Felix Street to Eagle Street
  • Edward Street between Charlotte Street to Mary Street
  • Felix Street between Margaret Street to Mary Street
  • Eagle Street between Mary Street to Queen Street
  • Market Street between Mary Street to Charlotte Street
  • Charlotte Street between Eagle Street to Market Street
  • Elizabeth Street between Creek Street to Eagle Street

The following roads will be closed from 4-10.30am Sunday 2 June:

Fortitude Valley 

  • Southeast bound half road closure on Gipps Street between Wickham Street to Ann Street

Kangaroo Point 

  • Northwest bound half road closure on Shafston Avenue between O’Connell Street to Main Street

Woolloongabba

  • Northbound half road closure on Main Street between River Terrace to Pearson Street

The following roads will be closed from 4-11am Sunday 2 June:

Fortitude Valley 

  • Ivory Street between Boundary Street to Brunswick Street
  • Ivory Lane between Boundary Street to End of Street
  • Martin Street between Boundary Street to Kemp Place
  • Bradfield Highway (Story Bridge) between Kemp Place to Main Street
  • Bowen Terrace between Kemp Place to Moray Street 
  • Kemp Place between Ann Street to Bradfield Highway 
  • Marshall Street between Ann Street to McLachlan Street

Kangaroo Point 

  • River Terrace between Main Street to Leopard Street
  • Leopard Street between River Terrace to Vulture Street
  • Vulture Street between Leopard Street to Allen Street

The following roads will be closed from 4.30-11am Sunday 2 June:

Teneriffe 

  • Macquarie Street between Kingsholme Street to Vernon Terrace
  • Vernon Terrace between Macquarie Street to Bell Street

The following roads will be closed from 4.30-11.15am Sunday 2 June:

New Farm 

  • Sydney Street between Brunswick Street to Lamington Street
  • Refinery Parade between Lamington Street to End of Street
  • Welsby Street between Gray Street to Lamington Street
  • Gray Street between Welsby Street to Merthyr Road 
  • Merthyr Street between Hawthorne Street to End of Street

The following roads will be closed from 4.30-11.30am Sunday 2 June:

New Farm 

  • Oxlade Drive between Griffith Street to Brunswick Street
  • Brunswick Street between Oxlade Drive to Sydney Street

The following roads will be closed from 4.30am-12 noon Sunday 2 June:

New Farm 

  • Dodwell Lane between Moray Street to Maxwell Street
  • Moray Street between Bowen Terrace to Merthyr Road
  • Merthyr Road between Moray Street to End of Street
  • Maxwell Street between Merthyr Road to Maxwell Street
  • Julius Street between Moray Street to End of Street
  • Griffith Street between Merthyr Road to Oxlade Drive 
  • Raff Street between Merthyr Road to End of Street
  • Riverview Court between Merthyr Road to End of Street

Parking conditions will temporarily change on the following streets to a ‘No Standing Tow Away’ zone from 7pm Saturday 1 June to 2pm Sunday 2 June: 

Brisbane City 

  • Alice Street between Edward Street to Albert Street
  • Margaret Street between Edward Street to Albert Street

Kangaroo Point 

  • River Terrace between Main Street to Llewellyn Street

Clem 7 tunnel will be toll free during the closure of the Story Bridge between 4-11am Sunday 2 June. 

Police, traffic controllers and signage will be in place to assist motorists, buses and pedestrians.

For event information, including road closures and parking changes, visit https://www.brisbanemarathon.com.au or call 07 5372 9410

For traffic information visit www.QLDTraffic.qld.gov.au or call 13 19 40. 

For public transport options visit www.translink.com.au or call TransLink on 13 12 30. 

Last updated:

Brisbane City Council acknowledges this Country and its Traditional Custodians. We pay our respects to the Elders, those who have passed into the Dreaming; those here today; those of tomorrow.