July 2024
Construction activities in July will include:
- continued works in Scott Street, including earthworks and concreting the northern footpath
- continued installation of the lift in C.T. White Park
- continued installation of the solar panels on the bridge deck
- continued works to install concrete furniture and garden beds on the bridge deck
- removal and resurfacing the asphalt along Main and Scott streets
- installing precast stairs connecting Scott Street to C.T. White Park and seating in C.T. White Park
- trenching and earthworks in C.T. White Park to install drainage
- continued installation of the pedestrian shade canopy and privacy screens on the bridge deck
- bridge deck concrete pours from C.T. White Park
- commence removal of temporary structures in the Brisbane River that supported the bridge deck.
What to expect
- construction activities including excavation, steel fixing, welding, scaffolding and concreting works
- barge movements for materials and equipment deliveries
- noise and low levels of vibration associated with the use of equipment and machinery such as cranes, rock breakers, concrete pumps, excavators and trucks
- lighting associated with night works
- traffic control and signage to direct pedestrians, cyclists, scooter riders and motorists around work as required.
Construction map
The construction map shows the indicative construction sites and progress of the bridge structure.
Accessible version
Out-of-hours works
Some works are required to be undertaken out-of-hours due to lane closure requirements and safety requirements working over the navigation channel in the Brisbane River.
Upcoming out-of-hours works will include:
- intermittent concrete pours from the Kangaroo Point site from 5am, Monday to Saturday
- low-impact bridge deck construction activities, which will continue until 5am, Monday to Saturday and include steel fixing, welding, transporting equipment and materials on barges, and crane lifts
- intermittent low-impact bridge works in the marine area, including the removal of temporary marine structures, works on the restaurant and canopy works from 5am-11pm, Monday to Saturday, weather and conditions permitting.
Contact Connect Brisbane
For more information about these works, contact Connect Brisbane by:
- calling 1800 864 221 (during business hours), or
- emailing the project team.