Upcoming traffic changes - Keating Street

There will be access and on-street parking changes for Keating Street from 14 January 2024 to allow for the regrading and reconstruction of intersection with Coonan Street.

These access changes will remain in place for three months, weather and site conditions permitting.

When will this work take place?

Day works will be carried out Monday to Saturday from 7.00am to 6.00pm.

Night works will be carried out Sunday to Thursday from 7.30pm to 5:30am.

To ensure the safety of motorists and road workers and to minimise traffic and service disruptions, some work is required to be undertaken at night when traffic volumes are lowest.

Access to Keating Street from 14 January

  • Keating Street will be changed to one-way only temporarily to allow for construction activities.  Residents will need to enter Keating Street from Coonan Street and exit onto Clarence Road.
  • Left turn from Keating Street to Coonan Street will be temporarily closed.
  • Left turn into Keating Street from Coonan Street will remain open.
  • No entry to Keating Street from Clarence Road.

Access to Indooroopilly Central shopping centre from 14 January

  • Entry driveway from Keating Street to Indooroopilly Central will remain open.
  • The exit from Indooroopilly Central to Keating Street will be temporarily closed. 
  • All other centre driveways remain open.

Access to 56 Coonan Street carpark

  • Carpark entry from Keating Street will remain open

Keating Street - on street parking changes

  • Some on street parking on Keating Street will be permanently removed (see map over page) due to construction activities and changing traffic conditions.
  • Vehicles parking in this area may be towed.
  • Linemarking and signage to advise of changed parking conditions will be installed.

How might this work impact me?

  • Access changes: for residents of Keating Street and visitors to Indooroopilly Central Shopping Centre.
  • Traffic control: reduced speed limits, lane closures, changes to traffic flow and short-term traffic disruptions.
  • Noise, dust and vibration: noise and possible dust and vibration may be experienced from the construction activities.
  • Temporary lighting: lighting towers are required to be used to light work areas at night to ensure worker safety.
  • Traffic delays: plan ahead and allow additional travel time.
  • Waste collection: the project team will liaise with Council’s Waste Services Team to ensure bin collection continues as scheduled.

Contact us

We thank you for your patience and cooperation during these essential works. If you have any questions, you can:

  • phone the project team on 1800 572 132 (during business hours)
  • phone Council’s Contact Centre on 07 3403 8888 (outside of business hours)
  • email the project team 
Date posted:
Last updated:

Brisbane City Council acknowledges this Country and its Traditional Custodians. We pay our respects to the Elders, those who have passed into the Dreaming; those here today; those of tomorrow.